project flag

Hydrofood Packing station

Mexico / Agro-Industry

weather

Hot

broller

Agro-Industry

cots

Clear panels integrated into design

gallery
gallery

אודות הפרוייקט : Hydrofood Packing station

Hydrofood’s 8700 Sqm Packaging center structure, engineered and constructed by Agrotop, processes 25kg/Sqm of fruits & vegetables from the 20 hectars (200,000 Sqm) of surrounding greenhouses.

The packing station structure for the Hydrofood company, engineered and constructed by Agrotop, is Hydrofood’s main center for fruits and vegetables packing, storing and shipping. At 145 x 60 meters, or 8,700 sqm – It processes 25Kg/Sqm of produce per day from the 20 Hectars (200,000 Sqm) of surrounding greenhouses.

Agrotop decided to use only panels, a high quality material, when engineering the structure, but chose a simple build design to keep construction costs low. Clear panels were integrated into the design at key locations to allow natural sunlight to enter the structure thus saving electricity costs during the operational stage.

Agrotop partnered with “Netafim” company that installed the heavy duty systems during the structure erection, coordinating the construction together in order to successfully meet the operation deadline.

Read more

הפרוייקט במספרים

20

Hectars of Greenhouses

8.7

Thousand Sqm Structure

25

Kg/Sqm processed per day

פתרונות בהם נעשה שימוש

v

Engineering

v

Packing Center

v

Construction

לקוחות מספרים עלינו

צור קשר

השאירו פרטים וניצור עמכם קשר בהקדם, אנחנו תמיד שמחים לסייע בכל שאלה.